November 25, 2025
Water Treatment Plant Upgrade
The District of Hudson’s Hope and BC Hydro continue to work collaboratively on the completion of the permanent water treatment system, and we are pleased to announce that BC Hydro and the District reached a final agreement on October 28, 2025.
The latest phase of construction at the Water Treatment Plant is now complete. The roof has been upgraded and strengthened so that the building meets current post-disaster standards. This work was carried out without any disruption to water service.
The next phase of work is scheduled to begin at the end of November. This phase will focus on preparing the inside of the plant for the new permanent treatment equipment. It will include removing older equipment that is no longer needed, installing new pipes and concrete bases inside the building, and upgrading the heating and ventilation systems so the plant can operate reliably through the winter.
Most of this work will take place inside the building, but residents may see construction vehicles and equipment around the plant while the work is underway. No water service outages are expected during this phase.
Commissioning of the full permanent system is still expected to take place in spring/summer 2026. Temporary disruptions to water service may be needed at that time as part of the final testing and tie-ins. We will provide more information in advance of any planned service interruptions.
If you have any questions about the ongoing work, please contact Desirée LeBlanc, Director of Public Works & Engineering, at 250-783-1455 or by email at desiree@hudsonshope.ca.
